国内免费久久久久久久久久-浪潮av色综合久久天堂-国产偷窥熟妇高潮呻吟-国产超碰无码最新上传-国产麻豆一精品一av一免费软件

會(huì)員登錄
請(qǐng)登錄您的生意號(hào),獲取電子名片。便于轉(zhuǎn)發(fā)分享!
取消
Tianda News
會(huì)員登錄
請(qǐng)登錄您的生意號(hào),獲取電子名片。便于轉(zhuǎn)發(fā)分享!
取消
Active coking flue gas treatment project supporting hot air furnace
Release Time:2021-11-19
Active coking flue gas treatment project supporting hot air furnace

Project Introduction:

Active coking method flue gas comprehensive treatment project, to achieve desulfurization, denitrification, dust removal, heavy metal removal, removal of dioxins integration. The activated carbon adsorbed and desulfurized by this process is heated to a certain temperature in the regeneration tower to release SO2, which is recovered and utilized. The active coke heat transfer medium is the high temperature hot flue gas produced by the hot gas generator. After heat transfer, most of the flue gas is circulated back to the hot gas generator for heating again by the high temperature heat exchanger fan, and the excess flue gas is discharged into the chimney.

Key technology:

1.The gas produced by the hot gas generator and the circulating gas should be well mixed together and the pressure drop should be reduced.
2.Fluctuations in supply pressure should be taken into account.
3.If the temperature of the heat generator surface exceeds 70 degrees, measures should be taken to prevent excessive heat loss. Metal mesh should be used for personal protection.
4.Suitable viewing Windows with air cleaning should be installed.
5.Heat loss due to thermal radiation should be reduced.
6.The equipment shall be operated and controlled by on-site control panel and central control room.
7.The exhaust gas release valve is used to control the pressure in the generator, and the constant pressure control is carried out by the exhaust gas release regulating valve.
8.Equipment includes ignition control. Automatic purge control. Combustion control. Release control and meet the requirements of operating procedures.
9.In order to facilitate network communication, the control system adopts DCS system for centralized control.

Innovative:

After discussion and research, the system adopts gas hot blast stove, jacketed air distribution device, PLC automatic thermal control system and other processes. The gas hot blast stove adopts double hollow structure. The hot blast stove consists of gas supply pipe valve system, combustion machine, air distribution device, combustion chamber and thermal control system. The shell of the combustion chamber of the furnace body is double ring steel structure: the front chamber is the furnace, lined with fire-resistant insulation layer, negative pressure flow of cold air inhalation between the inner and outer shell formed ring gap flow, can effectively absorb the external temperature of the inner ring of the furnace, improve the life of the furnace lining, reduce heat loss; The back chamber is a mixing air chamber, where the hot air in the furnace and the cold air in the ring gap are mixed simultaneously. The temperature of heating hot air of hot blast stove is adjusted by reasonable adjustment of gas volume and cold air volume. The gas stove is also equipped with explosion-proof device to ensure the safety of the equipment. Hot air is heated by negative pressure flow, and the flue gas outlet of hot blast stove is taken over to the regeneration tower equipment.
Jacket type air distribution device, and the hot air pipe form an integral whole, ring cooling air inlet, uniform air distribution, and take away the heat dissipation loss of the hot air pipe surface, reduce energy consumption, heat exchange tube can not be used as internal and external heat preservation, no air valve, obvious economic benefits.

Technical parameters:

1.Burners should be easy to service and clean. The main burner & igniter shall have two or more fire eyes.
2.All replaceable parts should be replaced within 40 hours.
3.The automatic control unit should be used to start and close the work, and the temperature fluctuation of the outlet flue gas should be controlled within ±5℃.
4.The high temperature flue gas produced by the heat generator system does not contain any incomplete combustion products, and the oxygen content is controlled less than 3%.
5.When designing the generator, it should be considered to reduce its pressure loss and give this value.
6.The dust content in the high temperature flue gas at the outlet of the heat generator is less than 25 mg/Nm3.

 

Home

Home

News

News

About

About

Products

Products

Contact

Contact

主站蜘蛛池模板: 久久丫免费无码一区二区| 特黄做受又粗又长又大又硬| 蜜臀av在线播放一区二区三区| 国产xxxx做受性欧美88| 久久国产成人精品国产成人亚洲| 国产精品丝袜亚洲熟女| 久久月本道色综合久久| 久久综合久久88中字幕文| 欧美孕妇xxxx做受欧美88| 真实国产乱子伦在线视频| 免费特黄夫妻生活片| 久久亚洲私人国产精品va| 丰满人妻一区二区三区免费视频| 怡红院成永久免费人视频新的 | 天堂中文官网在线| 黑人大群体交免费视频| 国产在线观看码高清视频| 色五月激情五月亚洲综合| 亚洲另类欧美综合久久| 中文在线а√在线| 无码成人免费全部观看| 色欲欲www成人网站| 久久久综合九色综合88| 偷柏自拍亚洲综合在线| 精品无码久久久久国产电影| 免费无遮挡无码视频网站| 亚洲中文字幕在线第二页| 暖暖 免费 高清 日本 在线| 青青草国产精品日韩欧美| 亚洲另类伦春色综合小说| 亚洲成色在线综合网站2018| 日韩毛片免费无码无毒视频观看| 99久热在线精品视频观看| www婷婷av久久久影片| 色综合视频一区二区三区44| 日韩一区二区三区四区区区| 7777久久亚洲中文字幕蜜桃| 国产女同疯狂作爱系列| av天堂永久资源网亚洲高清| 无码高潮喷水在线观看| 久久精品国产一区二区三区肥胖|